Building a cabin on a steep lot in Sevier County

You can, with more planning. Under the county zoning resolution, land with an average slope of 30% or more is in the Critical Slope district, and the building permit needs a detailed site plan from a registered land surveyor or professional engineer.

Does this apply to my lot?

Two questions decide it. First, is the land under the county's zoning, or inside a city? Inside Gatlinburg, Pigeon Forge or Sevierville, the city's planning department and its own rules apply instead.

Second, how steep is it on average? The county rules start at an average slope of 30%. A lot under 30% that sits no more than 100 feet above the road in the valley next to it is exempt from the development rules below (Section 313.2.1).

The average is worked out from a topographic map: 2 foot contours where the ground will be disturbed, 5 foot contours elsewhere, a grid over them, and one slope score for the whole lot (Section 313.3). That is surveying work, and we do it.

What the site plan has to show

For a building permit in the Critical Slope district, the county wants a detailed site plan prepared by a registered land surveyor or a professional engineer (Section 303.4.2), showing:

  • Existing contours at a 2 foot interval
  • The building, with porches, decks, overhangs and steps, and its distances to the front, side and rear lines
  • Entrances with finish floor elevations
  • The driveway's location and grade from the road to the parking area
  • The parking spaces, with spot elevations
  • Retaining walls around the building, with their estimated height
  • The minimum setbacks

Existing lots also show the proposed cuts and fills and the house seat, and follow the district rules as closely as possible (Section 313.4).

The order of the work

Each step needs the one before it, so starting in the right place saves weeks.

  1. Boundary and topographic survey. Where the lines are and how the ground lies. The slope score and every later drawing come from it.
  2. Septic permit, or sewer. The building permit application needs the septic permit from Sevier County Environmental Health, or a will-serve letter from the sewer utility (Section 303.4.1). The soil evaluation needs the lines and house site marked.
  3. Site plan. Drawn from the survey to the list above, with the cuts, fills, drive and house seat.
  4. Building permit. Through Sevier County Planning and Zoning for county land.
  5. Staking. The house corners, offsets and drive staked so the crew builds where the site plan says.
  6. Foundation location survey. After the foundation is in and before framing, the last cheap moment to catch a setback problem.
  7. As-built certification. The resolution asks for development in the district to be certified as built, by a licensed engineer or surveyor, within 60 days of completed work (Section 313.4.4).

The limits the county sets

From the Critical Slope district rules and the driveway section of the zoning resolution. The section number is in the last column so you or your builder can look it up.

RuleWhat the resolution saysSection
Cut and fill slopesNo higher than 35 feet. Taller engineered slopes need a variance from the Board of Zoning Appeals. Retaining walls may be required.313.4.1.1
Ground disturbedNo more than 25% of the lot area.313.4.1.2
Hard surfaces after buildingRoofs, drives and other impervious area no more than 15% of the lot area.313.4.1.4
UtilitiesInstalled below ground.313.4.1.3
ScreeningAt least 75% screened from the federal, state and county highways in leaf-on months (May through October).313.4.1.6
Space between homesSet by the fire water supply: 200 feet with none, 100 feet with 500 gallons a minute for 30 minutes, 50 feet with 750 or more. With residential sprinklers, 100 feet.313.4.2.1
Defensible space30 feet around the structure, kept to the Tennessee Division of Forestry Firewise standards.313.4.2.2
Size of new lots2 acres where the average slope is 30% to 49.9%, 3 acres at 50% or more. One home per lot.313.4.3
Driveway gradeThe first 20 feet from the road no steeper than 12%, the rest no steeper than 25%, at least 12 feet wide. Gravel only below 12%; steeper drives need pavers, concrete, asphalt or brick.306.4 to 306.6

Questions about steep lots

How steep is too steep to build in Sevier County?

The county zoning resolution does not set one cut-off for building. Land with an average slope of 30% or more is in the Critical Slope district, where the permit needs a detailed site plan and the development limits on this page apply. New lots must be at least 2 acres at 30% to 49.9% average slope and 3 acres at 50% or more.

How do I find out the average slope of my lot?

From a topographic survey. The resolution measures slope on a grid laid over the contours, 2 foot contours where the ground will be disturbed and 5 foot contours elsewhere, and averages it into one slope score for the lot.

Who can prepare the site plan for a steep lot?

The resolution says a Registered Land Surveyor or a Professional Engineer. Where the county staff decide it is needed, cuts and fills have to be designed by a licensed engineer.

Do I need the septic permit before the building permit?

The building permit application asks for the septic permit or certificate of completion from Sevier County Environmental Health, or a will-serve letter from the sewer utility. The soil evaluation for the septic permit needs the property lines and house site marked, so the survey comes first.

Can my driveway be gravel?

Only where its grade is under 12%. Steeper sections should be pavers, concrete, asphalt or brick, and no part of a private driveway may be steeper than 25%.

Do these rules apply inside Gatlinburg, Pigeon Forge or Sevierville?

No. They are the county rules for land under the Sevier County zoning resolution. Inside a city, the city planning department and its own rules apply. We check which applies to your lot before we start.

Ask about your lot

Send the address or parcel number and what you plan to build. We tell you what the lot needs and send a quote.

Phone or email, whichever you check.
On your tax bill or the county property search. Skip it if you do not have it.

We reply by the next business day. For something urgent, call (865) 453-7970.

Last updated